City of Wichita Aquifer Storage and Recovery Program

Pipeline projects

The city of Wichita's Aquifer storage and Recovery (ASR) program is currently in Phase II of four Phases of construction. Several pipeline projects are included in Phase II.

New steel pipe will replace a large portion of original water transmission lines, which date from the 1950s and are prone to breakage. The 15 mile main transmission line for the city of Wichita's water supply will be upgraded from 48 inch to 66 inch steel pipe. New water lines will be constructed, and lines to existing wells will be replaced with larger-capacity pipe. In all, about 30 miles of new pipeline will be laid as part of Phase II construction.

Workers set a 54" water line

Welding a 66" pipeline

Setting a 66" pipeline

Pipeline at the river intake

Pipe awating installation

Laying pipeline at 72nd street

Jack and bore crossing

Installing a valve

Backfilling a 54" steel water line

Manholes waiting to be installed

Pipes

72nd street transmission line

60" steel water manifold

54" intake pipe

36" pipe encasement